Organic Waste Converter excel industries,Mumbai
COPY RIGHTS : TO AVOID COPYRIGHT VIOLATIONS, ALL POSTS ARE SHOWN ALONG WITH SOURCES FROM WHERE ITS TAKEN. PLEASE CONTACT ME IN MY EMAIL SALEEMASRAF@GMAIL.COM , IF YOU ARE THE AUTHOR AND YOUR NAME IS NOT DISPLAYED IN THE ARTICLE.THE UNINTENTIONAL LAPSE ON MY PART WILL BE IMMEDIATELY CORRECTED.
I HAVE SHARED ALL MY PRACTICAL WATER TREATMENT EXPERIENCES WITH SOLVED EXAMPLE HERE SO THAT ANYBODY CAN USE IT.
SEARCH THIS BLOG BELOW FOR ENVO ,COMPACT STP,ETP,STP,FMR,MBBR,SAFF,IRON,ARSENIC,FLUORIDE,FILTER,RO,UASB,BIO GAS,AERATION TANK,SETTLING TANK,DOSING,AMC.
SEARCH THIS BLOG
Wednesday, April 20, 2016
Organic Waste Converter excel industries,Mumbai
Environmental Entrepreneur,Green Biz.NRN Murthy of Infosys says that we Indians are weak in execution.We need to realize the need and practice of gud project management. Form a group of competent Managers,Give them responsibilities and review the project from day One.
Friday, April 15, 2016
Biomethanation, UASBR, Bio Gas Plant
Copyright © 2011 Elsevier Inc. All rights reserved. http://www.ncbi.nlm.nih.gov/pubmed/21402222
Anaerobic digestion
From Wikipedia, the free encyclopedia https://en.wikipedia.org/wiki/Anaerobic_digestion Batch or continuous[edit]
- Anaerobic digestion can be performed as a batch process or a continuous process. In a batch system biomass is added to the reactor at the start of the process. The reactor is then sealed for the duration of the process. In its simplest form batch processing needs inoculation with already processed material to start the anaerobic digestion. In a typical scenario, biogas production will be formed with a normal distribution pattern over time. Operators can use this fact to determine when they believe the process of digestion of the organic matter has completed. There can be severe odour issues if a batch reactor is opened and emptied before the process is well completed. A more advanced type of batch approach has limited the odour issues by integrating anaerobic digestion with in-vessel composting. In this approach inoculation takes place through the use of recirculated degasified percolate. After anaerobic digestion has completed, the biomass is kept in the reactor which is then used for in-vessel composting before it is opened [28] As the batch digestion is simple and requires less equipment and lower levels of design work, it is typically a cheaper form of digestion.[29] Using more than one batch reactor at a plant can ensure constant production of biogas.
- In continuous digestion processes, organic matter is constantly added (continuous complete mixed) or added in stages to the reactor (continuous plug flow; first in – first out). Here, the end products are constantly or periodically removed, resulting in constant production of biogas. A single or multiple digesters in sequence may be used. Examples of this form of anaerobic digestion include continuous stirred-tank reactors, upflow anaerobic sludge blankets, expanded granular sludge beds and internal circulation reactors.[30][31]
Labels:
bio gas plant,
Biomethanation,
UASBR
New Delhi, India
New Delhi, Delhi 110001, India
Environmental Entrepreneur,Green Biz.NRN Murthy of Infosys says that we Indians are weak in execution.We need to realize the need and practice of gud project management. Form a group of competent Managers,Give them responsibilities and review the project from day One.
Tuesday, April 05, 2016
Decentralised integrated solid waste, waste water and solar energy project at New Motibagh, New Delhi
decentralised integrated solid waste, waste water and solar energy project at New Motibagh, New Delhi
Waste Water Management: About 70% of the 8 lakh litres of water supplied to the residents, that is, 5.6 lakh litres of waste water generated is treated in a decentralized waste water treatment plant within the campus using the Moving Bed Bio-reactor (MBBR) technology. There is a net savings of Rs.5 lakhs per annum due to direct and indirect savings from a decentralized Waste Water Treatment plant (WWTP) in the campus whose running cost is Rs.55.55 lakhs as opposed to the centralized sewerage system costing Rs.60.62 lakhs.
The energy savings from 300 solar street lights at the GPRA complex, covering internal roads, common areas, parking lots and bunglows, help in saving Rs.32.28 lakhs per annum. Along with solar water heaters, the savings on electricity is close to Rs.35 lakhs a year.
Therefore, a decentralised integrated solid waste, waste water and energy project for about 1000 households can achieve clean and green surroundings and financial savings to the tune of Rs.40-50 lakhs per annum
Therefore, a decentralised integrated solid waste, waste water and energy project for about 1000 households can achieve clean and green surroundings and financial savings to the tune of Rs.40-50 lakhs per annum
Environmental Entrepreneur,Green Biz.NRN Murthy of Infosys says that we Indians are weak in execution.We need to realize the need and practice of gud project management. Form a group of competent Managers,Give them responsibilities and review the project from day One.
Subscribe to: