WATER
MANAGEMENT PLAN For 500 Buffaloes/Day
Integrated Slaughter House
Bore well Water Quality
From the test report given by you:
|
Parameter |
Result (mg/L unless noted) |
|
pH |
8.31 |
|
TDS |
2247 |
|
Total Hardness |
782 |
|
Calcium |
93 |
|
Magnesium |
68 |
|
Sulphate |
271.4 |
|
Chloride |
635.9 |
|
Iron |
0.48 |
|
Fluoride |
1.64 |
The groundwater is saline/hard and not
suitable for direct drinking. Appropriate treatment (softening/RO for potable
use) is required.
Water Balance (Provided by
you)
|
Particular |
Quantity (KLD) |
|
Fresh Water Requirement |
|
|
Recycled Water from ETP |
|
|
Total Water Requirement |
|
|
Slaughter House |
|
|
Boiler |
|
|
Laundry |
|
|
Domestic & Canteen |
|
|
Lairage |
|
|
Refrigeration &
Cooling |
|
|
Rendering Plant |
|
|
ETP Feed |
500 |
|
Recycled Water Storage |
|
|
Irrigation/Plantation/Floor
Washing |
WATER
MANAGEMENT PLAN For 500 Buffaloes/Day
Integrated Slaughter House
Name : .
Address:
Submission to pollution
board, CGWA, FSSAI, APEDA/export auditors, and veterinary authorities
1. Executive Summary
The proposed slaughter house ------------
will process approximately 500 buffaloes per day.
The industry proposes to meet its freshwater
requirement through bore well abstraction after obtaining necessary permission
from CGWA and pollution board.
A comprehensive water conservation and
wastewater recycling system has been proposed. Treated wastewater from the
Effluent Treatment Plant (ETP) shall be reused for plantation, horticulture and
floor washing, thereby reducing fresh groundwater extraction.
Water Requirement Summary
|
Description |
Quantity (KLD) |
|
Fresh Groundwater
Requirement |
|
|
Recycled Water
Utilization |
|
|
Total Water Demand |
|
|
Wastewater Generation |
500 |
|
Wastewater Recycled |
|
|
Recycling Efficiency |
2. Industry Details
|
Item |
Details |
|
Industry Type |
Slaughter House |
|
Location |
|
|
Capacity |
500 Buffaloes/Day |
|
Source of Water |
Bore well Groundwater |
|
Regulatory Authority |
CGWA, Pollution Board |
|
Wastewater Treatment |
ETP 500 KLD |
|
Water Recycling |
Yes |
3. Groundwater Quality
Assessment
Groundwater quality was tested through
NABL-recognized laboratory analysis.
Key Observations
- High TDS (2247 mg/L)
- High Hardness (782 mg/L)
- Elevated Chloride (635.9 mg/L)
- Elevated Sulphate (271 mg/L)
.
PROPOSED
WATER TREATMENT SYSTEM
The plant shall maintain two separate water streams:
A. Potable / Process Water
Stream
Used for:
• Carcass washing
• Meat processing
• Equipment cleaning
• Personnel hygiene
• Hand wash stations
• Canteen and drinking purposes
Quantity
Approximately --- KLD
Treatment Scheme
Raw Water
↓
Raw Water Tank
↓
Pressure Sand Filter
↓
Activated Carbon Filter
↓
Reverse Osmosis Plant (RO)
↓
UV Disinfection
↓
Potable Water Tank
↓
Distribution
B. Utility Water Stream
Used for:
• Cooling tower make-up
• Rendering
section
• Floor washing
• Boiler
pre-treatment
• Miscellaneous utility services
Quantity
Approximately --- KLD
Treatment Scheme
Raw Water
↓
Pressure Sand Filter
↓
Softener
↓
Utility Water Tank
↓
Distribution
4. Water Requirement
Assessment
Water Consumption Details
|
Activity |
Water Requirement (KLD) |
|
Slaughter Operations |
|
|
Boiler Feed |
|
|
Laundry |
|
|
Domestic/Canteen |
|
|
Lairage Cleaning |
|
|
Refrigeration &
Cooling |
|
|
Rendering Plant |
|
|
Total |
Additional balancing/storage requirement
considered in overall plant operation gives total demand of ----- KLD.
5. Water Conservation
Measures
Process Optimization
- High-pressure low-volume washing systems.
- Trigger-operated wash guns.
- Dry cleaning of blood and solids before water
washing.
- Segregation of blood for rendering.
Housekeeping Measures
- Leak detection and repair programme.
- Water metering at major consumption points.
- Daily water consumption monitoring.
Equipment Measures
- Automatic shut-off valves.
- Float-operated storage tanks.
- Condensate recovery from boiler house.
Cooling System
- Closed-loop recirculation system.
- Drift eliminators in cooling tower.
- Blowdown control based on conductivity.
6. Wastewater Management
Wastewater Sources
- Slaughtering operations
- Floor washings
- Rendering section
- Laundry
- Domestic wastewater
Wastewater Generation
|
Description |
Quantity (KLD) |
|
Total Wastewater
Generation |
500 |
Proposed Treatment Scheme
Process Flow:
Bar Screen
→ Oil Trap with skimmer
→ Equalization Tank with drum screen
→ DAF System
→ Anaerobic Treatment (UASB)
→ Aerobic Biological Treatment( MBBR)
→ Secondary Clarifier
→ Pressure Sand Filter
→ Activated Carbon Filter
→ Treated Water Tank
Sludge:
DAF Sludge + Biological Sludge
→ Sludge Thickener
→ Volute Press
→ Authorized Disposal
7. Water Recycling and
Reuse
Treated Water Reuse
|
Reuse Area |
Quantity (KLD) |
|
Green Belt Development |
|
|
Plantation |
|
|
Floor Washing |
|
|
Total Reuse |
No treated wastewater shall be discharged
outside the premises under normal operating conditions.
Recycling Percentage
Recycling
Efficiency
.
8. Rainwater Harvesting
Proposal
To augment groundwater recharge, the
following structures shall be developed:
Recharge Pits
Rooftop Rainwater
Harvesting
Roof runoff shall be routed through:
Roof Drain
→ Silt Trap
→ Filter Chamber
→ Recharge Pit
Expected Benefits
- Improvement in groundwater recharge.
- Reduction in stormwater runoff.
- Compliance with CGWA guidelines.
9. Water Monitoring Plan
Flow Meters
Flow meters shall be installed at:
- Borewell discharge.
- Raw water tank outlet.
- ETP inlet.
- Treated water reuse line.
- Boiler make-up line.
Monitoring Frequency
|
Parameter |
Frequency |
|
Groundwater Abstraction |
Daily |
|
Water Consumption |
Daily |
|
ETP Flow |
Daily |
|
Recycled Water Use |
Daily |
|
Groundwater Quality |
Half Yearly |
|
Treated Effluent Quality |
Monthly |
10. Green Belt Development
|
Item |
Value |
|
Recycled Water Used |
60 KLD |
|
Irrigation Method |
Drip/Sprinkler |
|
Species |
Native Haryana Species |
|
Objective |
Water Conservation &
Environmental Improvement |
11. Water Balance Statement
|
Particular |
KLD |
|
Fresh Groundwater
Withdrawal |
|
|
Recycled Water Utilized |
|
|
Total Water Use |
|
|
Wastewater Generated |
|
|
Wastewater Recycled |
|
|
Evaporation/Process
Losses |
|
|
Product/By-product
Moisture Retention |
Balance |
12. Commitment
The unit commits to:
- Restrict groundwater abstraction to approved
quantity.
- Install digital water meters with telemetry as
required by CGWA.
- Recycle maximum treated wastewater.
- Maintain ETP continuously.
- Develop rainwater harvesting structures.
- Submit periodic groundwater abstraction and
water quality reports to CGWA.
- Adopt additional water conservation measures
as directed by CGWA.
Conclusion
The proposed slaughter house requires ---
KLD fresh groundwater while achieving --- KLD treated wastewater reuse,
resulting in ---% wastewater recycling. The proposed water management
system incorporates water conservation, wastewater recycling, rainwater
harvesting, and groundwater monitoring measures consistent with CGWA
requirements for industrial groundwater abstraction permissions.
Note: Attached documents:
- Borewell coordinates (latitude/longitude)
- Site area and built-up area
- Existing/proposed rainwater harvesting
calculations
- Greenbelt area details
- ETP design report(
Envo Projects, New Delhi)
- Hydrogeological report
from CGWA-approved consultant