Thursday, December 01, 2016

Cost details, saving and payback period from a biogas plant



BIO GAS PLANT


Civil Construction of Biogas Plant
1.     Mixer with stirrer to mix hot water (1:2) to form a slurry,
2.     Aerobic Digester,
3.     Anaerobic digeter
Mechanical Items :
Gas Holding MS Steel Dome
Steel Fabricated Covers on Manure Pits,
Mixer Stirrer 
Air Compressor
Solar Water Heater
Water Pump and Slurry Pump
Water and Gas Pipelines on Plant area
Electric Fittings & Miscellaneous

Cost details, saving and payback period from a biogas plant:

The cost details and the savings envisaged from the plant are given in the following table. The life of the plant could be 20-30 years and payback period is 4-5 years.
Capacity (Tons / Day)
Installation Cost (Rs In Lacks)
Monthly Operation and Maintenance Charges (Rs)
Methane Generation M3
Manure production (tons /day)
Area Required M2
Power
Manpower
Fresh Water (KL /day)
Hot water (Ltr / day of 50-60 C0)
Cooking Fuel (Equivalent to LPG Cyl / day)
1
30-35
8,000/-
100-120
0.1
300
5hp(2hr)
2
2
200
2-3
2
36-39
12,000/-
200-240
0.2
500
5hp(3hr)
3
3
400
4-5
4
60-65
22,000/-
400-480
0.3
700
5hp(3hr)
4
5
400
8-10
5
85-87
30,000/-
500-600
0.5
800
10hp (4hr)
5
7
600
12-14 (25Kw)
10
1 cr -1.2 cr
50,000/-
1000-1200
2.5
1200
15hp (4hr)
10
15
1000
22-25 (50Kw)
* This is an approximate cost for biogas generation plant and may increase by 10%–20%, depending on location, site-specific parameters, cost of materials, labour cost, etc., in different states/cities. Cost of additional infrastructure like office space, toilets, security, Godown, Shades and power generation will be extra, if required.
Rs – rupees; m3 – cubic meters; m2 – square meters; h – hour; kL – kilolitre; LPG – liquefied petroleum gas; kW – kilowatt; cyl –

2 comments:

MAGDY.. said...

السلام عليكم ورحمه الله وبركاته مرحبا بكم في شركه الزهره كلين لخدمات التنظيف والتعقيم في جميع انحاء المملكه العربيه السعوديه

شركه تنظيف بابها

شركه تنظيف منازل بابها

MAGDY.. said...

السلام عليكم ورحمه الله وبركاته مرحبا بكم في شركه الزهره كلين لخدمات التنظيف والتعقيم في جميع انحاء المملكه العربيه السعوديه

شركه تنظيف بابها

شركه تنظيف منازل بابها