Installation Guidelines for V notch

 

 

 

 

  • Use a 2mm Thick Mild Steel plate to make the V notch. Make a 90o V
  • Water surface downstream of the weir should be at least 6 cm below the bottom of the V to allow a free flowing waterfall.
  • The bottom of the "V" only needs to be 10 cm (=P) above the bottom of the upstream channel,
  • the approach channel (=B) only needs to be 2 ft. wide,
  • Head (h) should be measured at a distance of at least 4h upstream of the weir.

 

Q = 4.28 C tan(θ/2)( h+k)5/2

 

where
Q = flow rate (cfs)
C= Discharge Coefficient, C=0.578 for 90o V notch
θ = v-notch angle ( 90o
h = head on the weir (ft)
k = Head Correction factor(Ft)
  • k (ft.) = 0.0144902648 - 0.00033955535 Ø + 3.29819003x10-6 Ø2 - 1.06215442x10-8 Ø3
    where Ø is the V notch angle in degrees ( 90o

 

 

Source: ENVO PROJECTS. NEW DELHI-25 9899300371, 9810004529