Cost details, saving and payback period from a biogas plant



BIO GAS PLANT

Civil Construction of Biogas Plant
1.     Mixer with stirrer to mix hot water (1:1) to form a slurry,
2.     Aerobic Digester,
3.     Anaerobic digeter
Mechanical Items :
Gas Holding MS Steel Dome
Steel Fabricated Covers on Manure Pits,
Mixer Stirrer ,3 HP, 1 no
Air Compressor
Solar Water Heater
Water Pump and Slurry Pump
Water and Gas Pipelines on Plant area
Electric Fittings & Miscellaneous

Cost details, saving and payback period from a biogas plant:

The cost details and the savings envisaged from the plant are given in the following table. The life of the plant could be 20-30 years and payback period is 4-5 years.
Capacity (Tons / Day)
Installation Cost (Rs In Lacks)
Monthly Operation and Maintenance Charges (Rs)
Methane Generation M3
Manure production (tons /day)
Area Required M2
Power
Manpower
Fresh Water (KL /day)
Hot water (Ltr / day of 50-60 C0)
Cooking Fuel (Equivalent to LPG Cyl / day)
1
8-10
8,000/-
100-120
0.1
300
5hp(2hr)
2
2
200
2-3
2
10-12
12,000/-
200-240
0.2
500
5hp(3hr)
3
3
400
4-5
4
20-22
22,000/-
400-480
0.3
700
5hp(3hr)
4
5
400
8-10
5
28-30
30,000/-
500-600
0.5
800
10hp (4hr)
5
7
600
12-14 (25Kw)
10
65-70
50,000/-
1000-1200
2.5
1200
15hp (4hr)
10
15
1000
22-25 (50Kw)
* This is an approximate cost for biogas generation plant and may increase by 10%–20%, depending on location, site-specific parameters, cost of materials, labour cost, etc., in different states/cities. Cost of additional infrastructure like office space, toilets, security, Godown, Shades and power generation will be extra, if required.
Rs – rupees; m3 – cubic meters; m2 – square meters; h – hour; kL – kilolitre; LPG – liquefied petroleum gas; kW – kilowatt; cyl –