1.Touch and be touched:
studies have shown that people who are touched lovingly every day had significantly lower heart problems.
2.eat SEAWEED:
they have been shown to stabilise blood pressure, regualte levels of triglycerides,phospholipids,cholesterols.they dissolve any fatty buildup in the blood vessels, restore cardiac efficiency and prolong the life of the heart muscle.
3.eat GARLIC:
studies confirm garlics ability to lower blood pressure,reduce phospholipids,cholesterol, strengthen heart action,increase immune response,reduce platelet clumping and clotting (thus reducing strokes) and stabilise bloodc suger levels.Eat GARLIC raw or lightly cooked, several cloves a day.
4.Go for a WALK:
move. go for a walk. do it. regular exercise is key.
COPY RIGHTS : TO AVOID COPYRIGHT VIOLATIONS, ALL POSTS ARE SHOWN ALONG WITH SOURCES FROM WHERE ITS TAKEN. PLEASE CONTACT ME IN MY EMAIL SALEEMASRAF@GMAIL.COM , IF YOU ARE THE AUTHOR AND YOUR NAME IS NOT DISPLAYED IN THE ARTICLE.THE UNINTENTIONAL LAPSE ON MY PART WILL BE IMMEDIATELY CORRECTED.
I HAVE SHARED ALL MY PRACTICAL WATER TREATMENT EXPERIENCES WITH SOLVED EXAMPLE HERE SO THAT ANYBODY CAN USE IT.
SEARCH THIS BLOG BELOW FOR ENVO ,COMPACT STP,ETP,STP,FMR,MBBR,SAFF,IRON,ARSENIC,FLUORIDE,FILTER,RO,UASB,BIO GAS,AERATION TANK,SETTLING TANK,DOSING,AMC.
SEARCH THIS BLOG
Sunday, August 13, 2006
HEART OF THE MATTER--SAVE HEART MISSION
Environmental Entrepreneur,Green Biz.NRN Murthy of Infosys says that we Indians are weak in execution.We need to realize the need and practice of gud project management. Form a group of competent Managers,Give them responsibilities and review the project from day One.
UASB DESIGN PARAMETERS
UASB Design
In general, there are two ways to design an UASB reactor
If input COD: 5,000 - 15,000 mg/l or more, the design method should be used based on Organic Loading rate, (OLR) If input COD < 5000 mg/l, the design method should be calculated based on velocity.
Some H2S gas can pass the GSL separator and accumulate above the water level in the top of the reactor. This will be oxidized to sulphate by oxygen in the air to form Sulphuric Acid that will in turn cause corrosion of both concrete and steel. Below the water level: Calcium Oxide, (CaO), in concrete can be dissolve with by Carbon Dioxide, (CO2), in the liquid in low pH conditions. To avoid these problems, the material used to construct the UASB reactor should be corrosion resistant, such as stainless steel or plastics, or be provided with proper surface coatings, (e.g. coated concrete rather than coated steel, plastic covered with impregnated hardwood for the settler, plastic fortified plywood, etc).
Operation
Operation criteria: The optimum pH range is from 6.6 to 7.6 The wastewater temperatures should not be < p =" 350"> 20oC) and sometimes the start-up can take up to 3 – 4 months. In start-up process, hydraulic loading must be Ј 50% of the design hydraulic loading.
The start-up of the UASB reactor can be considered to be complete once a satisfactory performance of the system has been reached at its design load.
In general, there are two ways to design an UASB reactor
If input COD: 5,000 - 15,000 mg/l or more, the design method should be used based on Organic Loading rate, (OLR) If input COD < 5000 mg/l, the design method should be calculated based on velocity.
Some H2S gas can pass the GSL separator and accumulate above the water level in the top of the reactor. This will be oxidized to sulphate by oxygen in the air to form Sulphuric Acid that will in turn cause corrosion of both concrete and steel. Below the water level: Calcium Oxide, (CaO), in concrete can be dissolve with by Carbon Dioxide, (CO2), in the liquid in low pH conditions. To avoid these problems, the material used to construct the UASB reactor should be corrosion resistant, such as stainless steel or plastics, or be provided with proper surface coatings, (e.g. coated concrete rather than coated steel, plastic covered with impregnated hardwood for the settler, plastic fortified plywood, etc).
Operation
Operation criteria: The optimum pH range is from 6.6 to 7.6 The wastewater temperatures should not be < p =" 350"> 20oC) and sometimes the start-up can take up to 3 – 4 months. In start-up process, hydraulic loading must be Ј 50% of the design hydraulic loading.
The start-up of the UASB reactor can be considered to be complete once a satisfactory performance of the system has been reached at its design load.
VIDEO
New Delhi, India
New Delhi, Delhi 110001, India
Environmental Entrepreneur,Green Biz.NRN Murthy of Infosys says that we Indians are weak in execution.We need to realize the need and practice of gud project management. Form a group of competent Managers,Give them responsibilities and review the project from day One.
Thursday, July 13, 2006
yahoo password
http://www.digg.com/programming/Hack_Yahoo_Passwords_
Environmental Entrepreneur,Green Biz.NRN Murthy of Infosys says that we Indians are weak in execution.We need to realize the need and practice of gud project management. Form a group of competent Managers,Give them responsibilities and review the project from day One.
Subscribe to:
Posts (Atom)