COPY RIGHTS : TO AVOID COPYRIGHT VIOLATIONS, ALL POSTS ARE SHOWN ALONG WITH SOURCES FROM WHERE ITS TAKEN. PLEASE CONTACT ME IN MY EMAIL SALEEMASRAF@GMAIL.COM , IF YOU ARE THE AUTHOR AND YOUR NAME IS NOT DISPLAYED IN THE ARTICLE.THE UNINTENTIONAL LAPSE ON MY PART WILL BE IMMEDIATELY CORRECTED.

I HAVE SHARED ALL MY PRACTICAL WATER TREATMENT EXPERIENCES WITH SOLVED EXAMPLE HERE SO THAT ANYBODY CAN USE IT.

SEARCH THIS BLOG BELOW FOR ENVO ,COMPACT STP,ETP,STP,FMR,MBBR,SAFF,IRON,ARSENIC,FLUORIDE,FILTER,RO,UASB,BIO GAS,AERATION TANK,SETTLING TANK,DOSING,AMC.

SEARCH THIS BLOG

Showing posts with label CHECK LIST. Show all posts
Showing posts with label CHECK LIST. Show all posts

Sunday, July 03, 2005

ETP CHECK LIST

CHECK LIST –ETP ( INDUSTRIAL WASTE/DOMESTIC )

Introduction : Waste water is a combination of liquid and solid waste from residences,industries, commercial buildings, Instituions, together with any surface water which may be present.

Purpose of treatment : To reduce public health hazard of waste water by preventing pathogenic organisms and hazardous waste materials from entering water bodies from which potable water supply is taken out and to minimise the harmful impact of the waste water on the receiving stream and environment.

Sr No Description of item Observations
1 Type of waste ---
a) Domestic----- Municipal sewage water
b) Industrial--- Dyeing,paper,automobile,fertilizer,food processing, electroplating, and others
2 Manufacturing process sheet of concerned industry showing different sources of waste water release and qty
3 Waste water test report
BOD,
TSS,
PH,
TDS,
COD,
Oil & Grease
Detergents
Toxic elements (Chrome, cyanide,nickel etc)
Coliform bacteria
3 Quantity of waste water generated per day
4 Working hours per day
5 Flow rate= Qty/ working hours = liter per hour
6 Location plan of industry showing possible location of ETP/STP
7 If any ETP/STP already exists ? Yes/No
8 Project report of the existing ETP/STP
9 Problems encountered in the existing ETP/STP
10 Waste Water test report of existing ETP/STP at inlet and outlet point
11 Actual sizes of the different units of the existing ETP/STP
12 Whether reuse of treated waste water required ? Yes/No
13 Paper work like Consent application etc Done/ Not Done
14 If not done , whether to apply for
a) Consent to establish
b) NOC
15 Any other information

Contact person : Mr. Phone Number : Office = Res:
Address of Contact person :



Date of our visit :